On June 30, 2026, LIANHE MACHINERY completed the final container loading of a comprehensive production line for an Egyptian client's new manufacturing facility in Saudi Arabia. The shipment includes over 30 units of equipment, supporting the client's new high-standard production base and capacity expansion in the Saudi market. Despite the wide variety of equipment and a tight delivery schedule, the project team completed all factory testing and full-line trial runs on time.

This delivery represents a fully synchronized turnkey solution, integrating upstream water treatment, emulsification and compounding, diverse filling and capping systems, and downstream packaging lines. The configuration accommodates various batch sizes and process requirements, enabling flexible co-production of perfumes, creams, lotions, and other daily chemical products on the same line. The reverse osmosis water treatment system and storage tank modules provide reliable process water supply under the hot and dry local climate. Auxiliary equipment such as conveyors, filters, pneumatic pumps, and air cleaning machine are also included, completing the full material flow from feeding to finished packaging.

After shipment, LIANHE MACHINERY's engineering team will provide on-site installation and commissioning support in Saudi Arabia to assist the client in achieving scheduled production startup. This project serves as another practical validation of the company's turnkey delivery capability, and the team remains fully engaged in ensuring successful execution at the client site.
